日本植生 Official site

[Construction Example] Rockfall countermeasure and prevention work in areas with widespread boulders and gravel soil.

Examples of rockfall countermeasures and preventive works in a 200m² area with soil consisting of rock masses and gravel!

We would like to introduce a case where our "Tezak Super Lock (net type)" was installed for the slope protection work on the Major Local Road Nara Kasagi Line. This project was commissioned by the Nara Prefectural Civil Engineering Office and was carried out within Nara Prefecture. The soil type consists of rock blocks and pebbles, and it is a rockfall countermeasure and prevention work over an area of 200m2. The net type method involves installing wire ropes at 50cm intervals as auxiliary components, and it is applicable to rock slopes that are at risk of loose rocks and rolling stones. [Case Overview] ■ Project Name: Slope Protection Work on the Major Local Road Nara Kasagi Line ■ Location: Nara Prefecture ■ Construction Date: February 2022 (Year 4 of Reiwa) ■ Area: 200m2 ■ Soil Type: Rock blocks and pebbles *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Source control measures / rockfall prevention / rope laying work 'Tezak Super Lock'

PRODUCT

Distributors

Recommended products