[Construction Case] Close-contact rockfall prevention (rope laying work) for slope and flooding countermeasures.
Case from June 2021 (R3)! Implemented using a method that combines rope laying work with a thick wire mesh.
We would like to introduce a case where we installed the "Tezak Super Lock (contact type)" for rockfall prevention using rope laying work in the slope and flooding countermeasure construction of the town road Shimo-Harayama Kaiku Line. This project was commissioned by the Kawai Town Hall in Iwate Prefecture and was carried out in Iwate Prefecture. The area covered was 3,500 m², aimed at rockfall countermeasures and prevention. This method is designed to suppress the initial movement of scattered loose rocks and boulders on slopes through the flexibility of wire ropes and the restraining and supporting power of anchors. 【Case Overview】 ■ Project Name: Slope and Flooding Countermeasure Construction of the Town Road Shimo-Harayama Kaiku Line ■ Location: Iwate Prefecture ■ Construction Date: June 2021 (Year 3 of Reiwa) ■ Area: 3,500 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.