日本植生 Official site

[Construction Example] Erosion prevention of accumulated soil and prevention of rolling stone-type rockfalls through forestry conservation work.

Examples of construction methods suitable for sites where large and small boulders, floating stones, and soil are mixed!

We would like to introduce a case where the "Tezak Super Lock (G-spec)" was installed as a rockfall prevention rope work in the restoration and mountain conservation project in the Nabewari area. This project was commissioned by the Gunma Forest Management Office of the Kanto Regional Forest Management Bureau and was carried out in Gunma Prefecture. The area covered is 400m², with the soil type being rock and gravel. This method involves the installation of wire mesh and erosion control mats as auxiliary materials to prevent the erosion of accumulated soil while primarily preventing rockfall in the form of rolling stones. 【Case Overview】 ■ Project Name: Nabewari Area Restoration and Mountain Conservation Project ■ Location: Gunma Prefecture ■ Date of Construction: July 2020 (Reiwa 2) ■ Area: 400m² ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Source control measures / rockfall prevention / rope laying work 'Tezak Super Lock'

PRODUCT

Distributors

Recommended products