[Construction Example] Rockfall Protection Net on Steep Slope by the Roadside
The construction site in February 2021 (R3) is an example from Shizuoka Prefecture! The quantity is 1,150 m².
We would like to introduce a case where "rockfall protection nets (cover type/pocket type)" were installed during the reconstruction work of National Route 136. This project was commissioned by the Shimoda Civil Engineering Office in Shizuoka Prefecture and was carried out in Shizuoka Prefecture. The quantity was 1,150 m², and the purpose was rockfall countermeasures and prevention. The method used (pocket type) involves installing openings with H-shaped supports at the top of the wire mesh to catch falling rocks from the upper source within the mesh. 【Case Overview】 ■ Project Name: Reconstruction Work of National Route 136 ■ Location: Shizuoka Prefecture ■ Construction Date: February 2021 (Year 3 of Reiwa) ■ Quantity: 1,150 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.