日本植生 Official site

[Construction Case] An example of a site where it is difficult to grasp the location and quantity of rockfall sources.

A case of a construction method suitable for sites where it is difficult to grasp the location and quantity of rockfall sources, such as when surface soil is fully accumulated.

This is an introduction to a case where the rockfall prevention rope installation "Tezak Super Lock (G-spec)" was implemented in restoration and erosion control work. The project was commissioned by the Higashi-yo Regional Bureau of Ehime Prefecture and carried out in Ehime Prefecture. It involved securing scattered rockfall sources and preventing the occurrence of new rolling stones and floating stones due to surface erosion. The accompanying erosion control mat is designed to protect the surface layer over the long term, combining erosion prevention effects with a foundation for plant growth. 【Case Overview】 ■ Project Name: Restoration and Erosion Control Work ■ Location: Ehime Prefecture ■ Date of Construction: 2020 (R2) ■ Area: 700 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Source control measures / rockfall prevention / rope laying work 'Tezak Super Lock'

PRODUCT

Distributors

Recommended products