[Construction Example] Rockfall prevention that accommodates difficult machine access in the back of residential houses and on mountain slopes.
No need for large machinery! Examples of construction methods that do not require large or specialized machinery.
We would like to introduce a case where the rockfall prevention rope installation "Teza Super Lock (G-spec)" was carried out as part of the Hiji River levee maintenance work. This was ordered by the Ozu River National Highway Office of the Shikoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism. The construction site is in Ehime Prefecture, with a quantity of 150m². In this method, the necessary machinery consists mainly of a hand hammer and an air compressor, allowing for construction even in difficult-to-access areas such as behind private homes or on mountain slopes. 【Case Overview】 ■ Project Name: Hiji River Levee Maintenance Work ■ Construction Location: Ehime Prefecture ■ Construction Date: 2019 (Reiwa 1) ■ Quantity: 150m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.