[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.
Standard equipped with automatic irrigation system! A case study of thin-layer parking greening method installed on pavement.
In the fiscal year 2018 (H30), we would like to introduce a case where the "Tafutafu Park 55," a type of green parking method installed on pavement, was implemented in the greening project of a private factory employee parking lot. The existing asphalt was excavated by 55mm, and our product was embedded. Due to the limited number of parking spaces for employees, the project was divided into sections to ensure that employee parking could be maintained during construction. Please feel free to contact us if you have any inquiries. [Case Overview] ■ Project Name: 2018 (H30) Fiscal Year Private Factory Employee Parking Lot Greening Project ■ Location: Hyogo Prefecture ■ Construction Date: March 2019 (R1) ■ Area: 400m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.