日本植生 Official site

[Construction Case] Greening of Employee Parking Lot Due to Insufficient Green Space for New Building Construction

An example of a green parking lot that prevents soil compaction due to vehicle pressure and maintains a root growth layer!

In the 2020 fiscal year, we would like to introduce a case where the integrated base layer parking greening method "Tafutafu Park" was implemented in the greening work of a private factory employee parking lot. Due to the construction of a new building on the site, there was a shortage of green space, so the employee parking lot was greened. With limited yard space on the site, we were able to carry out the work in small batches without affecting the factory's operations. 【Case Overview】 ■ Project Name: 2020 Fiscal Year Private Factory Employee Parking Lot Greening Work ■ Location: Osaka Prefecture ■ Construction Date: December 2020 ■ Area: 2085m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

PRODUCT

Tafutafu Park construction

TECHNICAL

Distributors

Recommended products