[Construction Example] Recovery of Damaged Lawn! Greening of Parking Lot
Even if the grass is damaged, it can recover! A case study of integrated pavement layer greening method for parking lots.
In the 2020 fiscal year, we would like to introduce a case where "Tafutafu Park" was constructed at the parking lot of the Kusatsu City No. 2 School Lunch Center. This project was commissioned by the Kusatsu City Hall and carried out in Shiga Prefecture. The area covered was 415 m². This method allows grass roots to extend into the sub-base layer (crushed stone layer), enabling recovery even if the surface of the grass is damaged. 【Case Overview】 ■ Project Name: 2020 Fiscal Year Kusatsu City No. 2 School Lunch Center Parking Lot ■ Location: Shiga Prefecture ■ Construction Date: February 2021 ■ Area: 415 m² ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.