日本植生 Official site

[Construction Example] Adopted for the green parking lot of Gifu Prefectural Office. Over 90% high vegetation coverage!

Green coverage rate over 90%! The protruding parts of the grass protection material are designed to withstand minimal pressure and load.

In the 2022 (R4) fiscal year, we would like to introduce a case where the integrated pavement layer parking lot greening method "Tafutafu Park" was implemented at the Gifu Prefectural Office parking lot construction project. This was developed in conjunction with the new main building. Due to the high frequency of use, we are maintaining the grass by avoiding construction under the engine area. In this method, the pavement layer (crushed stone layer) temporarily stores rainwater and allows it to slowly permeate into the ground. 【Case Overview】 ■ Project Name: 2022 (R4) Gifu Prefectural Office Parking Lot Construction Project ■ Location: Gifu Prefecture ■ Construction Date: March 2022 (R4) ■ Area: 1,040 m² ■ Purpose: Parking lot *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

PRODUCT

Distributors

Recommended products