[Construction Example] A grassy area in a dog run where the grass tends to wither easily due to feces and urine.
Case from December 2019 (R1)! Implemented using a construction method that secures the root growth layer.
We would like to introduce a case study of the pressure-resistant green space construction method "Grass Strong" implemented at the Chiba Park Interaction Square. This project was commissioned by the Mito City Hall and carried out in Ibaraki Prefecture. The area covered was 2110 m², aimed at creating a grass square. This method features a structure that secures the root growth layer, preventing compaction due to foot traffic, and allows for a grass square that is free of protrusions, making it accessible for both people and vehicles. 【Case Overview】 ■ Project Name: 2019 (R1) Year Chiba Park Interaction Square ■ Location: Ibaraki Prefecture ■ Construction Date: December 2019 (R1) ■ Area: 2110 m² ■ Purpose: Grass Square *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.