日本植生 Official site

[Construction Example] A grassy area accessible to people and vehicles. Temporary parking during events.

A structure that ensures the growth layer of roots, preventing compaction due to foot traffic! An example of being used as a parking lot.

We would like to introduce a case of the pressure-resistant green space greening method "Grass Strong" implemented at the Tondabayashi Park lawn area, which also serves as a temporary parking lot. This project was commissioned by the Kishiwada Civil Engineering Office and carried out in Osaka Prefecture. During events, white lines are drawn to designate parking spaces. This method allows the lawn area to be used as a space accessible to people and vehicles, with no protrusions on the surface. 【Case Overview】 ■ Project Name: 2018 (H30) Tondabayashi Park Lawn Area and Temporary Parking Lot ■ Location: Osaka Prefecture ■ Construction Date: March 2018 (H30) ■ Area: 5,100 m² ■ Purpose: Lawn Area *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Rainwater infiltration and foot pressure-resistant square greening method "Grasstrong"

PRODUCT

Distributors

Recommended products