日本植生 Official site

Tafutafu Park construction

We can accommodate changes from other construction methods! We will propose specifications suitable for the site.

The "Tafutafu Park" handled by Nippon Shokusei Co., Ltd. can be installed by landscaping and paving contractors without the need for specialized professionals. We can introduce various models tailored to usage frequency and budget. By combining factors such as overall thickness (excavation pressure) and the presence of underground irrigation, we can propose specifications suitable for the site. Additionally, we can accommodate changes from other construction methods and strive to ensure that you can feel the benefits in terms of construction days, maintenance of greenery, and costs, so please feel free to consult with us. 【Features】 ■ Can be installed by landscaping and paving contractors without the need for specialized professionals ■ Introduction of construction contractors is also possible ■ Can be installed in 5 days for spaces accommodating 10 to 20 units *For more details, please download the PDF or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/method/method-749/

basic information

【Model】 ■ High-spec model: Tough Tough Park t = 280mm specification (used with underground irrigation system) ■ Standard model: Tough Tough Park t = 280mm specification ■ Low-cost model: Tough Tough Park t = 180mm specification *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

【Purpose】 ■Parking lot greening *For more details, please download the PDF or feel free to contact us.

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

PRODUCT

Tafutafu Park construction

TECHNICAL

Large netted lawn grass "Kyoriyokka 21" <Stress Resistance>

PRODUCT

Rainwater infiltration and foot pressure-resistant square greening method "Grasstrong"

PRODUCT

Distributors

Recommended products