日本植生 Official site

[Construction Example] A grassy area that can also serve as a venue for stalls and stage events.

Introducing a case study of Grasslong installation at a facility used as a temporary parking lot in the lawn square!

We would like to introduce a case where "Grasstrong," which we handle, was installed at Senba Fureai Park in Ibaraki Prefecture. During events at the park adjacent to Kairakuen and Senba Lake, when there is a shortage of parking, the lawn area can be opened up and used as a parking lot, and stalls and a stage can be set up for the event. To be used as a temporary parking lot, a structure that includes a sub-base layer is necessary, and the Grasstrong construction, which integrates the sub-base layer, was adopted. [Case Overview] ■ Construction in 2020 ■ Grasstrong 2,100m2 *For more details, please download the PDF or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

【Structure of Grass Long】 ■ Turf: Kyoryokka 21 ■ Surface layer: Green Fill C + Sand ■ NS sub-base layer type 150: Kyoryoku Keep under + Single-sized crushed stone No. 4 + Sand ■ GS Net *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Construction Case: Glass Strong

TECHNICAL

Rainwater infiltration and foot pressure-resistant square greening method "Grasstrong"

PRODUCT

Rainwater infiltration and foot pressure responsive square greening method "Grasstrong" *Free on-site survey available.

PRODUCT

Distributors

Recommended products