Paved Surface Installation Type Parking Lot Greening Method "Tough Tough Park 55"
We can convert the existing parking lot into green space with the maximum area and the shortest construction period.
【Features】 ■ Direct installation on existing pavement! ■ Possible to construct in divided small areas ■ Green coverage rate of over 90% ■ Elimination of height differences with existing pavement is also possible There is no need for the removal of existing asphalt or earthworks, which can reduce removal and disposal costs. The construction period can also be shortened, allowing for minimal yard work even when a factory is operational or alternative parking cannot be provided. If lowering is required, separate consideration for drainage methods (such as buried drains) will be necessary. If alternative parking spaces cannot be secured during the construction period, the construction area can be divided for execution. There have been cases where approximately 100 parking spaces were constructed in three phases (approximately 10 to 20 spaces over about 5 days). The protruding parts of the grass protection material are designed to withstand the minimum necessary pressure and load (supporting a total weight of 25 tons), protecting the grass from damage caused by vehicle pressure and abrasion. During expansions or renovations of factories, the maximum green space can be secured within limited areas such as employee parking lots, compensating for any lack of green space. (The criteria for inclusion in green space may vary by municipality) *Please feel free to contact us for more details.
basic information
【Lineup】 ■ Installed on existing pavement - Tough Tough Park 55 ■ With subgrade improvement - Tough Tough Park t=280mm specification (with underground irrigation system) - Tough Tough Park t=280mm specification - Tough Tough Park t=180mm specification ■ Without subgrade improvement - General parking lot greening *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
- Securing green space during expansion and renovation - Counting asphalt-paved parking lots as green space - Renewal of green spaces that have deteriorated and are no longer considered green - Measures for factory location law - Enhancing added value with green landscapes - Use as public open space - Environmental facilities / exterior works / repairs / reduction of industrial waste - Measures against rainwater infiltration obstruction / rainwater runoff control / rainwater infiltration and storage - Green infrastructure
catalog(3)
Download All CatalogsDistributors
Since our founding, we have taken on the mission of "creating a green country" and have contributed to national greening, land conservation, and the creation of a rich natural environment through our greening projects. Even in the 21st century, often referred to as the era of the environment, we strive to be an "environmental creation company" that applies the technologies we have cultivated in greening to the improvement of the environment for the Earth and its people, engaging in creativity (planning, research, and development). In 2024, we recognize biodiversity conservation, a pressing social issue, as a new mission we must undertake, with our participation in the 30by30 Alliance and the certification of our research fields as "natural coexistence sites." Moving forward, we will actively address various social issues, starting with biodiversity conservation, in pursuit of a sustainable society. We aim to be a lasting company that meets the needs of local communities, promoting the greening of parking lots to mitigate the heat island effect, as well as greening watersheds, riverbanks, coastlines, and parks to propose a lush living environment.


























