日本エンヂニヤ Official site

[Case Study] Freed from dangerous sediment removal work at necessary water sources during flooding.

The installation of a water screen reduces the number of cleaning operations and lightens the burden!

Normally a clear stream, but when it floods, there is a significant amount of sediment flow. In this river, the water intake using the existing catchment basin frequently became blocked, requiring regular removal of fallen leaves and sediment. To reach the water source, one had to climb a rocky, fast-flowing area, which posed dangers and became a significant burden for the elderly managing it. Therefore, a water screen "WSS-B-25M" was installed. The frequency of fallen leaf removal and sediment cleaning at the water source has been greatly reduced, and even during heavy rains, it can maintain a stable and sufficient water intake without blockage. 【Overview】 ■ Location: Nishimera Village, Koyu District, Miyazaki Prefecture ■ Installation Period: Fiscal Year 2018 ■ Construction Overview: WSS-B-25M x 1 unit *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.nippon-engineer.co.jp/case/181/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Japan Engineering Co., Ltd. Company Profile

COMPANY

Distributors

Recommended products