Water intake device on the back of the flow panel "WSS Water Screen"
When you have trouble with surface water intake! It enables stable water intake with less likelihood of clogging.
The "WSS Water Screen" is a product that allows for surface water intake. It adopts a rear water intake method using our unique technology of a special screen. In addition to its structure that is resistant to clogging, maintenance can be performed with simple tasks, significantly reducing the burden of managing and maintaining the water source. The compact design of the main unit makes it easy to install on existing weirs, allowing for effective utilization of the equipment. 【Features】 ■ Resistant to clogging ■ Easy maintenance ■ Small installation space ■ Easy installation on existing weirs ■ Low construction costs *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Lineup】 ■WSS-1 Type ■WSS-2 Type ■WSS-3 Type ■WSS-4 Type ■WSS-5 Type ■WSS-6 Type ■WSS-7 Type *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Main Delivery Locations】 ■ Hokkaido: 2 units of Type 1, water intake of 100m3/day ■ Aomori Prefecture: 4 units of Type 7, water intake of 6000m3/day ■ Yamagata Prefecture: 1 unit of Type 4, water intake of 450m3/day ■ Shiga Prefecture: 1 unit of Type 6, water intake of 1000m3/day ■ Nagano Prefecture: 1 unit of Type 2, water intake of 200m3/day ■ Fukui Prefecture: 2 units of Type 7, water intake of 3000m3/day ■ Kagoshima Prefecture: 2 units of Type 6, water intake of 2000m3/day *For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
[Before Construction] This is a photo taken before construction. When you touch the floor in this condition, your hands will turn white. This is called laitance, which is the weak part of the concrete that sticks to your hands. Once seal hardening is applied to that floor, it will transform into a floor with a pleasant texture.
-
【Grinding Process】 Thoroughly check the condition of the floor before starting the grinding. In the case of FGS specifications, construction is carried out after a curing period of more than two weeks from the concrete placement. If the concrete is less than two weeks old, it may not withstand grinding and could delaminate. This is a point that must be confirmed during discussions with the general contractor.
Related Videos
catalog(2)
Download All CatalogsDistributors
Nihon Engineering Co., Ltd. is a company engaged in the design and construction of water supply facilities, manufacturing and sales of water-related equipment, as well as the design and construction of small hydropower generation (debris removal) and related equipment manufacturing and sales. Based on our long-standing achievements in water supply facility construction and maintenance management, we provide proposals grounded in the field. With our unique technology driven by the spirit of "water supply professionals" and "manufacturing," we respond to our customers' concerns and dilemmas.














































