Equipment utilization rate of over 80%! Efficiency of small hydropower generation achieved through dust removal devices.
We will introduce examples of head tank installations that can be utilized for forestry promotion through electricity sales revenue.
We would like to introduce a case where a dust removal device, model 'JJS-C', was installed at the head tank of the Miori Power Plant No. 2 in Nishi-Awakura Village, Okayama Prefecture. Water flow began in June 2021, and power generation started, achieving an equipment utilization rate of over 80%. The revenue from electricity sales is being utilized for forestry promotion. The maximum water usage is 400L/second, and this product was jointly developed with Shinshu University, Fujimaki Construction Co., Ltd., and JSE Co., Ltd. 【Case Overview】 ■ Maximum water usage: 400L/second ■ Maximum effective head: 66.43m ■ Maximum output: approximately 199kW *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.