Pile stud method
Achieve high reliability and shortened construction time for the joint connection! Outstanding work efficiency and low cost!
The pile stud method is a technology that allows for design and construction that maximizes the performance of piles, significantly reduces construction by-products associated with the work, and enables short construction periods. 【Contact Information】 ■ Technical Inquiries Technical Development Department Phone Number: 03-3624-6201 ■ Inquiries for Estimates and Transactions For inquiries regarding estimates and transactions, please contact the respective branch via the URL below. http://www.okabe.co.jp/network/group.html
basic information
The pile stud method is a technique in which pile stud reinforcement (KSW490) is welded as joining rebar to the steel plate at the pile head.
Price range
Delivery Time
Applications/Examples of results
Joining technology for precast concrete piles and foundation slabs.
catalog(3)
Download All Catalogs
Pile stud method

NCP Anchor
