岡部 Official site

Crown pile anchor

SC Pile - Pile Head Jointing Method

The crown pile anchor is a construction method that involves partially welding a fixture (pile head fixture) that connects a fixing member (pile head anchor) to the steel pipe of an SC pile at the construction site, and then connecting the pile head anchor to the hexagonal coupler part of the pile head fixture to integrate the pile head with the foundation concrete. 【Contact Information】 ■ Technical Inquiries Technical Development Department, Phone Number: 03-3624-6201 ■ Inquiries for Estimates and Transactions For inquiries regarding estimates and transactions, please contact each branch via the URL below. http://www.okabe.co.jp/network/group.html

basic information

● The foundation excavation depth can be made shallower, making it economical. The crown pile anchor has a fixing plate at the end of the pile head anchor, which provides excellent anchoring performance. As a result, compared to the conventional method of directly flare welding rebar to the pile steel pipe, the anchoring length is shorter, allowing for a shallower foundation excavation depth. Therefore, cost reductions for excavation, shoring, and handling of surplus soil are expected.

Delivery Time

OTHER

Applications/Examples of results

Scope of application: Concrete piles with outer steel pipes (SC piles)

Okabe Corporation General Catalog

CATALOG

Crown pile anchor

PRODUCT

Distributors

Recommended products