Summer cold water, winter hot water, water temperature management for the construction and civil engineering industry OKM-CHN series.
Temperature management of mixing water in summer and winter maintains the quality of on-site mixing materials!
【Features】========================== ◆Stable supply of optimal mixing water temperature for construction sites! Equipped with cooling and heating functions, it can be used regardless of summer or winter. ◆Eco function significantly reduces preparation time to about 25 minutes! It was common to think, "Since we will start pouring at 8:30 after the morning meeting, we need to prepare by 4 AM." Thanks to the eco function, the cooling time from about 30°C to about 10°C has been shortened to approximately 25 minutes. ◆A wide variety of tank sizes to choose from! ============================== Feel free to contact us.
basic information
This is a cooling water supply device used for temperature control of water used in mixing non-shrink grout, PC grout, and other materials. When there is concern about the rise in mixing temperature of the materials due to heat generation from the hydration reaction, cold water is used... When there are concerns about the deterioration of grout material fluidity during winter construction, warm water is used... This further enhances the reliability of the materials mixed on-site. *The PC grout construction manual specifies that care should be taken regarding mixing temperature during hot weather (average temperature above 25°C) and cold weather (average temperature below 4°C).
Price information
-
Price range
P5
Delivery Time
OTHER
Applications/Examples of results
Temperature control of mixing water for grout mortar, spray mortar, etc.
Related Videos
catalog(3)
Download All Catalogs
