Hotel Edition: OSK Suspended Scaffolding Enables Repair Work While Operating
It is possible to set up scaffolding in complex spaces with obstacles! We can also solve your concerns about wanting to carry out repair work without disrupting business operations.
We provide the "OSK Method" for internal ceiling construction at hotel entrances. With this method, we do not set up scaffolding inside the entrance, allowing hotel operations to continue without interruption and enabling business to remain open. Additionally, even in complex locations, scaffolding can be installed in the ceiling space, improving maintenance accessibility in the future. If no longer needed, the scaffolding can also be removed. 【Features of the OSK Method】 ■ Work can be carried out during business hours, shortening the construction period ■ The total square meter count can be reduced compared to conventional methods ■ Overall costs can be lower in comparison *For more details, please download the PDF or feel free to contact us.
basic information
【Solving these concerns】 ■ I want to carry out repair work but avoid disrupting business operations. ■ I want to conduct construction while maintaining the ceiling and decorations in the entrance area. ■ I want to shorten the construction period as much as possible. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.