ロンタイ Official site

[Construction Achievement Introduction] Ronket DX Type 3

◎Vegetation mat for soft rock and hard soil◎Case study introduction◎

Construction Date: May 2019 Product Name: Ronket DX Type 3 Site Conditions: Cut soil (sandy soil) Construction Location: Sendai City, Miyagi Prefecture Application: Solar power generation Construction Quantity: 624 square meters Seed Mixture: Mixed with non-native species (long grass and short grass) Due to the exposure of some hard soil and the urgent need for greening, Ronket DX Type 3 was adopted! For more details, please feel free to contact us. -------------------------------------------------------------------------------- Rontai offers free slope surveys at construction sites. For more information, please contact your nearest branch or sales office. --------------------------------------------------------------------------------

basic information

For more details, please feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please feel free to contact us.

[Construction Case Studies] Vegetation Mat for Soft Rock and Hard Soil 'Ronquet DX (Deluxe)'

TECHNICAL

[Catalog] Vegetation Mat for Soft Rock and Hard Soil 'Ronquet DX'

PRODUCT

[Introduction Flyer] Soft Rock I / Hard Soil Vegetation Mat 'Ronquet DX' *Slope Protection

OTHER

[Work Rate, Placement Diagram, Construction Method] Vegetation Mat for Soft Rock I and Hard Soil 'Ronquet DX2 Type'

DOCUMENT

[Work Rate, Placement Diagram, Construction Method] Vegetation Mat for Soft Rock I and Hard Soil 'Ronquet DX3 Type'

DOCUMENT

【Work Rate, Placement Diagram, Construction Method】Vegetation Mat for Soft Rock I and Hard Soil 'Ronquet DX4 Type'

DOCUMENT

[Work Rate, Placement Diagram, Construction Method] Vegetation Mat for Soft Rock I and Hard Soil 'Ronquet DX6 Type'

DOCUMENT

CAD data(1)

Model number overview File
[Drawing] Ronquet DX3 Type
  • 2D dxf ( 140KB)

News about this product(1)

Distributors

Recommended products