菱建基礎 本社 Official site

All Casing Application Method: Existing Structure Demolition Work

Active in the foundation removal of underground structures due to redevelopment construction and new foundation work!

Our company has carried out the "Removal of Existing Structures" using the all-casing method. The all-casing method, introduced from France's Benot company, has evolved with the times, transitioning from a swinging type to a fully rotating type. What was once difficult, such as excavating hard rock and reinforced concrete, has become possible due to advancements in technology and skills, as well as the experience we have gained. It is now actively used in the removal of underground structures associated with redevelopment projects and in new foundation construction. 【Obstacle Removal Flow】 1. Installation 2. Excavation (reaching the obstacle) 3. Press-in excavation 4. Excavation 5. Obstacle crushing 6. Obstacle removal complete 7. Backfilling (fluidized treated soil) 8. Backfilling complete *For more details, please refer to the PDF document or feel free to contact us.

Our company's homepage is here.

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Distributors

Recommended products