白崎コーポレーション グリーンナップ事業 Official site

[Construction Method] In the case of NAXS S1000

Selecting the right sheet according to the intended use and site conditions is important! Achieving high-quality weed control installation.

Here is the translation: This is an introduction to the installation method for the weed control sheet "Nax S1000" (recommended use of fixing pins: 4 pieces/m²). First, remove weeds and large stones to level the ground, and clean the adhesive areas, then install the S1000 so that it is in contact with the ground. Next, securely fix it with large-headed nails (200 with resin) to prevent it from lifting, and finally, adhere the overlapping parts to the structure. 【Installation Method】 ■STEP 1: Leveling the ground ■STEP 2: Cleaning the adhesive areas ■STEP 3: Installing the S1000 ■STEP 4: Fixing with large-headed nails (200 with resin) ■STEP 5: Adhering the overlapping parts and to the structure *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.shirasaki.co.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Residential and Exterior Dedicated Weed Control Sheet "Nax Series Comprehensive Catalog"

PRODUCT

Distributors

Recommended products