昭和コンクリート工業 Official site

Precast retention basin

By making the swimming pool underground, the upper area can be used for the schoolyard, parking lot, park, etc., and by replacing the bottom slab with crushed stone, it can also be utilized as an infiltration facility.

■The upper part can be used as a schoolyard, parking lot, park, etc. ■A significant reduction in construction time is possible. ■It leads to a reduction in total costs. ■The retention basin will serve as a disaster prevention base during earthquakes. ■By replacing the bottom slab with crushed stone, it can also be used as an infiltration facility.

Related Link - https://www.showa-con.co.jp/products/%e9%98%b2%e7%…

basic information

【Product Configuration】 - Stand type (without groundwater) - Stand type (with groundwater) - Box type *For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Disaster Prevention Catalog Showa Concrete

PRODUCT

Distributors

Our company, under the belief of contributing to society through the development of social infrastructure, constantly strives for quality improvement and technical advancement. With the conviction that business is about people, we respect humanity and foster a free and open corporate culture through talent development and fair personnel practices. We aim to deepen mutual understanding and trust, working together towards the development of the company and the enhancement of welfare, while concentrating all our efforts on stabilizing and expanding our management foundation.

Recommended products