SiftDDD Official site

[Reinforcement Support] Shortening the preparation period before the start of construction for super high-rise buildings and large-scale redevelopment projects.

In the project where a digital mockup was created, the preparation period before construction was shortened by 4 months!

Our "Reinforcement Support Service" enables the reduction of preparation time before the start of construction for super high-rise buildings and large-scale redevelopment projects. In large-scale projects with many work zones and stakeholders, pre-construction considerations significantly impact the overall schedule. In cases where a digital mock-up was created, the preparation period before construction was shortened by four months. We received feedback from the site manager stating that there was a cost reduction effect of 5-10%. Additionally, we have supported sites that were halted due to scandals and successfully completed them within the scheduled timeframe. 【Main Deliverables】 ■ Q&A document for designers summarizing inconsistencies in design drawings ■ 3D data for reinforcement support (showing interference points and areas with insufficient anchorage in color and markings) ■ List of points of caution ■ Optional: Steel hole drilling diagrams / Reinforcement detail drawings for joints / Reinforcement drawings for walls and slabs *For more details, please download the PDF or feel free to contact us.

Related Link - https://hiknsien.siftddd.jp/

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Distributors

Recommended products