Dust collection vertical grinder method for stripping paint containing lead and other substances.
[Video Introduction] Numerous achievements in repainting work for the longevity of bridges! Surface preparation can be done while keeping lead dust concentration below 0.05mg/m3.
The dust collection vertical grinder (Rotopin) method allows for surface preparation while keeping the lead dust concentration below 0.05 mg/m3. It is mainly used for repainting projects aimed at extending the lifespan of bridges and pedestrian bridges. We have prepared multiple types of tools, allowing for selection based on the target area. This method has been widely adopted because it is "safe," "cost-effective," and "usable by local companies." 【Features】 ■ Achieves dust concentration of 0.05 mg/m3 or lower in the work environment ■ Cost reduction ■ Usable by local companies ■ Multiple types of tools available for selection based on the target area ■ Widely adopted around the world, contributing to the safety of workers
basic information
【Products Offered】 ■ Rotopin ■ Needle scaler ■ Disc grinder ■ Vacuum suction recovery device ■ Negative pressure dust removal device *For more details, please refer to the PDF document or feel free to contact us.
Price range
P5
Delivery Time
P4
The delivery date may change depending on the quantity.
Applications/Examples of results
【Usage】 <Adopted in various fields> ■ Lead paint stripping ■ PCB coating removal 【Track Record】 Tokyo Metropolitan Area, Metropolitan Expressway, Bayshore Route Kanagawa Prefecture, Yokohama City, NEXCO East Japan Expressway Kimitsu City, Chiba Prefecture, multiple bridges Nanjo Town, Gifu Prefecture, bridge structures Sakudaira City, Nagano Prefecture, Shin-Shinonoi Bridge Ashikaga City, Tochigi Prefecture, Hirata Pedestrian Bridge Kobe City Waterworks Bureau, Chikarakari Water Pipe Bridge, water pipe section and truss section Yoshika Town, Shimane Prefecture, Otani Bridge Ministry of Land, Infrastructure, Transport and Tourism, Shikoku Regional Development Bureau, national road overpass Kumamoto City, NEXCO West Japan Expressway, etc. 【Target Areas】 Cables / Bridges / Water pipe sections / Truss sections / Pedestrian bridges Soundproof walls / Bridge girders / Supports / Nuclear power plants *For more details, please refer to the PDF document or feel free to contact us.