All products and services
1~30 item / All 55 items
-
Georegistration method
In-situ tests to understand the effects of improved ground.
last updated
-
For deep excavation work and cutting/removal of underground obstacles! Super Top Method.
The construction of place-driven piles in ground with boulders or bedrock, as well as deep excavation work, demonstrates its effectiveness in cutting and removing underground obstacles.
last updated
-
Shinbee method
Ground improvement method using soil-cement columns with thin-walled steel pipes.
last updated
-
SEP method
Soil displacement suppression with a dedicated screw! A high-quality and eco-friendly pile foundation reinforcement method that replaces soil with cement milk, unaffected by soil quality.
last updated
-
TRD method
Continuous underground wall construction possible at a height of 10m and maximum depth of 60m with machinery!
last updated
-
Construction Case Study "TRD Method"
Basic information about the TRD method and various construction examples are provided! Outstanding stability! Capable of constructing underground continuous walls at a maximum depth of 60 meters with a machine height of 10 meters!
last updated
-
TRD-wide method
The "TRD-wide method" is a wide-type "TRD method." The use of large core materials allows for a reduction in support materials!
last updated
-
CCC method
Soil-cement diaphragm wall method applicable to hard ground with N value of 100 or more.
last updated
-
Mini wall construction method
A ground continuous wall method that can accommodate narrow sites and allows for construction at a maximum depth of 20 meters with small machinery. It can also be adapted for permanent retaining walls through the installation of concrete sheet piles!
last updated
-
Construction Case Study: "Mini Wall Method"
Basic information on the mini wall construction method and various case studies are included! It can accommodate narrow sites and can achieve a maximum depth of 20m with small machinery!
last updated
-
Bubble drilling method
Patent obtained and NETIS registered! A ground continuous wall construction method that can reduce the amount of generated excavated soil.
last updated
-
HiroWork Kmighty Method
NETIS registration! The "full-length extraction method" pulls out existing piles with ultra-low vibration and ultra-low noise.
last updated
-
Bauer method
Excavation of underground obstacles and all-casing foundation pile work can be carried out close to the boundaries even in sites where buildings and structures are densely packed!
last updated
-
Rotary crushing and mixing method
Realizing the effective use of all construction-generated soil! Applicable to the separation and improvement of debris-mixed soil generated by disasters!
last updated
-
Structural Repair Method (Suiheikun)
Jack up the foundation! Safely correct subsidence with an automatic jack control management system without causing distortion to the building.
last updated
-
RBP wall construction method
[NETIS Registration] A cut slope reinforcement construction method that enables safe construction by combining reverse bolt panel version and rebar insertion work.
last updated
-
Construction Case Study "RBP Wall Method"
[NETIS Registration] A cut slope reinforcement construction method that enables safe construction by combining reverse bolt panel version and rebar insertion work.
last updated
-
NSPC W method
NETIS registration! A lightweight embankment construction method that allows for shortening construction time and reducing costs by making panel materials self-supporting!
last updated
-
Construction work
"Total support from the ground to the building" - Proposals that can only be made by ground professionals! Building safe structures from the ground up!
last updated
-
Construction Case Study: "Building Construction"
"Total support from the ground to the building" We are showcasing examples of construction work.
last updated
-
Exterior and rooftop waterproofing work
The exterior and rooftop waterproofing deteriorate rapidly after 20 years! Taking measures around 15 years can help reduce repair costs!
last updated
-
Mode Cell Method
Acquisition of technical evaluation: A mechanism that is easy to repair without compromising the basic performance, enabling inexpensive and rapid repairs during liquefaction.
last updated
-
High Grip Grout Method
[NETIS Registration] Chemical injection method that reduces injection loss during construction.
last updated
-
Super Multi-Point DP Construction Method
Various liquid injections are possible! A method that allows simultaneous injection at 16 points with one unit.
last updated
-
Expacker method
Possible extensive solidification! Construction injection method technology using permanent grout material.
last updated
-
JSG method / CJG method
Core methods of ultra-high pressure jet grouting! Jet grout "JSG method" "CJG method"
last updated
-
RJP method
It is also possible to create a fan-shaped improvement body (90° to 270°) using a shaking method!
last updated
-
PJG method
NETIS registration! Ultra-high pressure injection mixing method that allows for high-speed construction and adjustment of the improvement range.
last updated
-
MJS Method (Metrojet System)
Enables large-diameter high-pressure injection stirring in all directions from horizontal to diagonal and vertical!
last updated
-
TSC method
Acquisition of construction technology examination certification! NETIS registration! Deep mixing treatment method using cement-based solidification materials.
last updated