多機能フィルター Official site

[Construction Example] Steep Slope (Combined with Restraint Method)

Introducing a case where the combined use of erosion control methods led to full greening without causing erosion or other issues!

We would like to introduce a case where our multifunctional filter was used for slope protection on a steep gradient. The construction site adopted a method combining stabilization techniques to ensure the stability of the slope. Although it is a steep gradient (1:5), the area, including around the pressure plate, has achieved full greening without causing erosion or other issues. 【Case Overview】 ■ Construction Location: Fukui Prefecture ■ Product Used: Multifunctional Filter "MF-45R-10wn" ■ Construction Details - Adopted while ensuring slope stability by combining stabilization techniques - Achieved full greening without causing erosion or other issues, including around the pressure plate *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.takino.co.jp/mf.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Distributors

Recommended products