One way to reduce the cost of setting up a skate park is...
I will convey one proposal to resolve the issue of "cost" while actually installing within the budget!
Skate parks are often said to have a "concrete surface" as the basic standard, and the installation costs are high! This is because skateboarding, which is a sport involving wheel diameter, can lead to "serious injuries" if the condition of the concrete is poor, making it impossible to settle for a mediocre surface condition, which requires time and effort. However, there are ways to reduce costs! Our company has the know-how to transform even poorly conditioned concrete surfaces into smooth, long-lasting surfaces. Only Willbee can finish existing parks to a level that surpasses new constructions. Both "new installations" and "renovations" will be transformed into long-lasting surfaces with minimal injury risk.
basic information
The "Seal Hard Skate Park Specification" is a construction method product provided through the following steps 1 to 4. [Patent pending] ◆1. Concrete Grinding (for renovation only) The roughened concrete surface is shaved down to remove surface irregularities. ◆2. Concrete Polishing For newly installed concrete: Smooth out surface trowel marks, trowel lines, and fine irregularities to create a surface without roughness. For renovated concrete: Further smooth the surface from the previous grinding process to eliminate grinding marks and fine irregularities, creating a surface without roughness. ◆3. Penetrating Surface Hardener Seal Hard This is a concrete surface hardener that "penetrates" rather than "coats," ensuring no peeling. It provides strong dust resistance and wear resistance to the concrete. ◆4. Water Absorption Suppressor (Water Repellent) Aquapel Plus This is a concrete surface water absorption suppressor (water repellent) that "penetrates" rather than "coats." It exhibits water absorption suppression effects over the long term.
Price information
The price varies depending on the construction area. Please contact us for more details.
Delivery Time
Model number/Brand name
Seal hard skate park specification surface finish
Applications/Examples of results
Skate parks that have been resurfaced with the "Seal Hard Skate Park Renovation Specification" instead of being newly constructed: - Higashi Kanazawa Sports Plaza Skate Park (Kanazawa City, Ishikawa Prefecture) - NIX Street Sports Park (Toyama City, Toyama Prefecture) - Sasebo Park Skateboard Park (Sasebo City, Nagasaki Prefecture) - Nagao Skate Park (Sanuki City, Kagawa Prefecture) - Sumida Skateboard Park (Sumida Ward, Tokyo) Skate parks that have been finished with the "Seal Hard Skate Park New Construction Specification": - Green Park Daimon Skateboard Plaza (Imizu City, Toyama Prefecture) - Tiger Lux Skateboard Park Nagai (Osaka City, Osaka Prefecture) - Nitto Shinko Stadium Maruoka Skateboard Plaza (Sakai City, Fukui Prefecture) - Toyo Carbon Urban Sports Park (Marugame City, Kagawa Prefecture) - Ishioka Skateboard Park (Ishioka City, Ibaraki Prefecture)
Detailed information
-
[Case 1] Ishioka Skateboard Park
-
Surface irregularities
-
【Before Construction】 Step difference at the joint
-
Before construction: Trowel marks
-
To a smooth, even, and long-lasting road surface!
-
The effects of AquaPel Plus: AquaPel Plus not only repels rainwater but also plays a role in adjusting the important grip feel for skateboards.
catalog(13)
Download All Catalogs

CAD data(1)
Model number | overview | File |
---|---|---|
Standard Drawing for Skate Park Surface Specifications | The "Seal Hard Skate Park Specification" is a construction method provided in the following steps 1 to 4. [Patent pending] ◆1. Concrete grinding (for renovation only) ◆2. Concrete polishing ◆3. Penetrating surface hardener Seal Hard ◆4. Water absorption suppressor (water repellent) Aquapel Plus This is a pavement specification created based on past achievements. Please feel free to copy and use it when designing future skate parks. |
|