Dome-shaped shelter [for personal use]
By connecting the divided parts, it is possible to maintain "greater strength"!
Since it is a type that connects units, the installation location can be customized to a size that can accommodate dozens of people, depending on the number of evacuees. By linking the divided parts, it is possible to maintain "greater strength."
basic information
Wooden structure use <5t・10t・30t・50t> S size (for 2 people) W800D2400XH1600mm M size (for 4 people) W1300XD2400XH1600mm
Price range
Delivery Time
Model number/Brand name
WNI-SHELTER
Applications/Examples of results
For more details, please contact us.
Detailed information
-
【Joint Filler】 SSP100 is a joint filler born in the USA. It is made of a material called polyurea, which is "micro-elastic." This micro-elasticity makes it suitable for joint filling. It has a hardness that follows the expansion and contraction of concrete. It is a strong material that is different from seals and caulking.
-
【Joint Filling】 SSP100 (joint filling material) viewed from the side. It adheres well to concrete and sets in about 5 minutes after injection. The work efficiency is also good, and ordering it together with Seal Hard can shorten the construction period.
-
【Petrotex Oil Absorption Suppressant】 Industrial oil is used in factories, and that oil splashes and stains the floor. This is a concern for factory owners. The oil absorption suppressant is manufactured by the same company that produces Seal Hard. It is also a permeable material, free from peeling and flaking. It penetrates and forms a membrane inside the concrete that suppresses oil absorption, delaying the intrusion of oil and water. The recommended specification for factories and restaurants is 【Seal Hard + Petrotex】.
-
【Construction Scene】 Water washing is an essential part of any specification. Weak layers and dirt on the concrete surface are removed with a polisher and vacuumed up. This is a crucial process that cannot be omitted in seal hardening work.
-
[First Construction After Photo] This is the floor after washing, applying seal hard, and removing residues. We will now have a curing period of about two weeks before starting the second phase on-site. This two-week period is important for increasing strength.