仮橋仮桟橋工
仮橋仮桟橋工
山間部・河川・ダム湖・災害復旧など、あらゆる現場環境に適応可能な仮橋・仮設構台の急速施工です
1~3 item / All 3 items
-

Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"
Eliminating the need for high-altitude work while significantly shortening the construction process and improving safety.
last updated
-

Phoenix Stage Method
Achieving rapid construction of temporary piers in low headroom! Suitable for work platforms in low headroom situations such as road construction and railway bridges.
last updated
-

Temporary bridge and temporary pier construction method with a 20m span integrated installation - L pier construction method.
Reduction of the number of piles due to the long span girder construction! Temporary bridge and temporary pier construction using a 20m span unified erection method.
last updated