ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Official site

Greenery-inducing special fabric formwork "Beltail GP Mat Method"

We will create a solid green earth with concrete bodies and plant coverings.

This is an environmentally focused slope protection work that combines high-strength synthetic fiber special fabric formwork with vegetation engineering. It creates a solid green earth through the covering of concrete structures with plants. 【Features】 ○ High strength ○ Special fabric formwork ○ Natural color For more details, please contact us or download the catalog.

Related Link - http://www.asahi-kasei.co.jp/agt/

basic information

【Features】 ○ Vegetation engineering ○ Drainage function ○ Labor-saving and cost reduction ○ High-strength hardened body ○ Lightweight ○ Ground-following capability ● For more details, please contact us or download the catalog.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

【Purpose】 ○ Dam lake shore slope protection work ○ Adjustment pond and reservoir bank slope protection work ○ River and waterway bank work ○ Road construction site slope protection work ○ Others ● For more details, please contact us or download the catalog.

Greenery-inducing special fabric formwork "Beltail GP Mat Method"

PRODUCT

Introducing a case study of step-type revetment construction in farm pond bank protection works! NETIS registered technology, fabric formwork "Beltail" construction case study.

TECHNICAL

On-site construction case study: "Proposing labor-saving methods for important structures such as railway structures!" Introducing a case study of labor-saving methods using fabric formwork and FabriForm mats!

TECHNICAL

On-site construction example: "Introducing a case study of temporary drainage channel construction in emergency response work!" Case study of fabric formwork "FabriForm" used in emergency response temporary drainage channel construction.

TECHNICAL

On-site construction example: "Proposal for an alternative method for slope protection at the backfill area next to the sediment control dam!" Proposal for a change in the fabric formwork "FabriForm" method - construction example.

TECHNICAL

Flow Control Type Fabric Formwork Method

PRODUCT

On-site construction example: "Introducing a case of slope protection for high-standard road substructures!" Fabric formwork "Fabreform" used for slope under the superstructure - construction case study.

TECHNICAL

Distributors

1. Contributing to the harmony between people and the natural environment with outstanding civil engineering technology. 2. Optimally connecting the demand and supply of civil engineering and environmental business. 3. Challenging the creation of new value.

Recommended products