Marine material "Grout Jacket"
Ideal for section water stopping at the joint of steel pipe sheet piles! A method for injecting and filling with grout material.
The "Grout Jacket" is a method used in civil engineering works such as ports and rivers, where a grout jacket (tube-shaped bag) is inserted into the joint section during the foundation and temporary cutoff using steel pipe sheet piles, and grout material is injected and filled to prevent water from entering through the joint. 【Product Lineup】 ○W-840B-250 ○W-840B-190 For more details, please contact us.
basic information
【Specifications】 ○Model Number: W-840B-250/W-840B-190 ○Tensile Strength (N/5cm (kgf/5cm)) Vertical: 3,924 (400) or more Horizontal: 540 (55) or more ○Elongation Rate (%) Vertical: 30 or less Horizontal: 50 or more ○Joint Diameter (mm): 200/165 ●For more details, please contact us.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
【Purpose】 ○Sectional water stop for steel pipe sheet pile joints ●For more details, please contact us.