ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Official site

[Construction Case] Block Mat Method "Solcomat"

Proposal for disaster recovery methods for riverbank protection in earthquake damage!

We would like to introduce a case where the "Solcomat" energy-saving connected block method was adopted for the restoration work of river levees. In this site, several major earthquakes occurred repeatedly in a short period, causing subsidence of the river levee and cracking of the levee surface. A challenge was the difficulty in procuring materials for emergency restoration of the levee. Our product can sometimes be delivered within a manufacturing lead time of about 10 to 14 days. In this case, the work was completed within one month from the occurrence of the disaster to the completion of the construction. [Case Overview] ■Challenge - Difficulty in procuring materials for emergency restoration of the levee. ■Result - The work was completed within one month from the occurrence of the disaster to the completion of the construction. *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.asahi-kasei.co.jp/advance/kankyou/slop…

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

On-site construction case study: "Proposal for disaster recovery methods for riverbank protection in the event of major earthquake damage!" Block mat method "Solcomat" construction case study.

TECHNICAL

Distributors

Recommended products