ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Official site

[Construction Case] Fabric Formwork "FabriForm"

It is possible to shorten the construction period! Introducing examples of temporary drainage construction in emergency response projects.

We would like to introduce a construction case of the fabric formwork "FabriForm" used in the emergency measures for temporary drainage works. In this site, a large-scale landslide disaster occurred in a mountainous area due to heavy rain caused by a large typhoon. It was necessary to construct a temporary drainage channel to drain a large amount of water that was accumulating urgently. Therefore, we proposed the use of fabric formwork "FabriForm" as a surface protection work that could shorten the construction period, and it was adopted. 【Features】 ■ Can be constructed with a small number of workers and in a short time, leading to reduced construction period and cost ■ Can be constructed underwater ■ Can be constructed in places where heavy machinery cannot enter ■ Mats can be produced to fit the shape of the site *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.asahi-kasei.co.jp/advance/kankyou/slop…

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

On-site construction example: "Introducing a case study of temporary drainage channel construction in emergency response work!" Case study of fabric formwork "FabriForm" used in emergency response temporary drainage channel construction.

TECHNICAL

Distributors

1. Contributing to the harmony between people and the natural environment with outstanding civil engineering technology. 2. Optimally connecting the demand and supply of civil engineering and environmental business. 3. Challenging the creation of new value.

Recommended products