ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Official site

[Construction Case] Proposal for Energy-Saving Connection Block Method "Solcomat"

We propose an alternative method for slope protection at the backfill area next to the sediment control dam!

We would like to introduce a case where we proposed the energy-saving joint block method "Solcomat" for the construction of concrete sediment control dams. In this site, it became difficult to install concrete secondary products and rock fragments generated on-site on the slopes. Therefore, we proposed and adopted the construction of a surface protection work that could shorten the construction period. The Solcomat, which is integrated with filter cloth, has a flexible structure that accommodates differential settlement. 【Features of the adopted method】 ■ Enables quick construction, reducing construction time and costs ■ The manufacturing method allows for immediate demolding, enabling shorter delivery times ■ A flexible structure integrated with filter cloth that accommodates differential settlement ■ Excellent permeability through the mesh of the filter cloth *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.asahi-kasei.co.jp/advance/kankyou/slop…

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

On-site construction example: "Proposal for an alternative method for slope protection at the backfill area next to the sediment control dam!" Proposal case for labor-saving joint block method "Solcomat."

TECHNICAL

Distributors

Recommended products