クリテック工業 本社、大阪営業所、福岡営業所 Official site

Check before construction! Essential tools for expansion joint replacement work.

We will introduce the necessary tools and equipment for each type of work, such as cutter work and concrete pouring!

So far, we have mainly introduced the types and selection methods of expansion joints. The construction procedure for expansion joints (repair work) generally follows this flow: pre-construction → cutter work → removal of existing expansion joints → installation of the product → fixing (welding, etc.) → pouring of backfill concrete → completion. At Expansion Joint Navi, we introduce the equipment necessary for the installation of expansion joints in accordance with the construction flow. For more details, please refer to the related links. [Contents] ■1. Cutter Work ■2. Removal of Existing Expansion Joints ■3. Product Installation ■4. Fixing (Welding, etc.) ■5. Concrete Pouring ■Summary *For more details, please refer to the related links page or feel free to contact us.

Related Link - https://jointnavi.net/joint/dougu/

basic information

For more details, please refer to the related link page or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related link page or feel free to contact us.

Distributors

Recommended products