【Waterproofing Material for Penetrations】Non-drying Polyolefin-based Single-component Waterproofing Putty Tometarou
NETIS: Can be installed even in flowing water conditions (after leakage, during water flow)! Non-hardening water stop putty, suitable for hand holes/cable and pipe penetration areas for various types of leaks.
TometaroⓇ is a non-curing, polyolefin-based waterproofing putty for leak prevention and repair. It adheres firmly to resin, rubber, metal, and concrete, making it a versatile waterproofing material that can also be applied in flowing water conditions. It is suitable for leak prevention in electrical equipment handholes and cable/pipeline penetration areas. It is resistant to salt, acid, and alkali, and does not cure after opening, allowing for long-term storage within specified conditions. ◎ R2.6 Issued "Guidelines for Flood Prevention Measures for Electrical Equipment in Buildings" ◎ <Features> ■ Heat resistance up to 90°C, stable waterproofing without yielding to high-pressure cables ■ Putty alone/waterproof performance of 0.05MPa (with options, 0.15MPa) ■ Usable even during leaks (in flowing water) ■ Consideration for cable re-entry, allowing for removal and re-filling ■ Unlike curing waterproofing materials, it does not shrink upon curing, allowing for continuous waterproofing ■ A sense of security with a wealth of adoption records in both public and private sectors ■ Safe rodent prevention, blocking rodent intrusion ■ A wide range of options to accommodate various situations ■ "Japan Quality: NETIS Product" trusted quality ■ Ecology & Safety, friendly to people and the environment *For details, please request a catalog from "Contact Us" or view the PDF data from "Download"。
basic information
◆Prevention and measures against water leakage along laid cables ◆Water leakage treatment in handholes ◆Prevention and measures against water leakage from cable conduit materials and gaps in wall joints ◆Prevention and measures against water leakage around sleeves ◆Prevention and measures against water leakage around ducts ◆Prevention and measures against water leakage from concrete cracks ◆Sealing and condensation prevention inside cubicles, etc. ◆Prevention of rodent intrusion and environmental pest control TometaroⓇ Channel [EPJ INC.] ● Tometaro filling construction video (Version 3) https://www.youtube.com/watch?v=S-U0qXw_u9o ● Concept and product PR video https://www.youtube.com/watch?v=QuMCVKnroHQ ~Usage instructions are available on YouTube; please be sure to check before filling work. If you have any questions regarding handling, please feel free to contact us at the information below~ Contact: EPJ INC. TEL: +81 3-5643-8137 FAX: +81 3-5643-8138 Email: info@epj-inc.co.jp
Price range
Delivery Time
Model number/Brand name
TOMETARO
Applications/Examples of results
*R2.6 National Public Works Announcement: "Guidelines for Flood Prevention Measures for Electrical Equipment in Buildings" *R3.4 (Public Foundation) Japan Sewerage New Technology Organization: "Promotion of Waterproofing (Final Version)" Rapid increase in adoption for the same countermeasure construction. Electrical Equipment (Handhole pipe openings, underground penetrations, around piping) Mechanical Equipment (Underground penetrations, around piping) Civil Engineering & Architecture <Selected Delivery Records for Power Companies> - T Hokkaido Electric Power: O Kawahara Power Plant - Chubu Electric Power: H Okayama Power Plant - Tokyo Electric Power: Adachi Ward Water Leakage Measures - Chubu Electric Power: Chubu Electric Power PG Salt Power C Maintenance - JE A: Hekinan Power Plant - Tokyo Electric Power: Tokyo Electric Power North Substation Flood Prevention Measures - T Hokkaido Electric Power: T Hokkaido Electric Power Ishinomaki Substation Construction - National Research and Development Agency N Nuclear Power Research and Development Organization: T Flood Prevention Measures - Chugoku Electric Power: Chugoku Electric Power Network Co., Ltd. Substation Flood Prevention Measures - Tokyo Electric Power: Tokyo Electric Power Kawasaki Power Plant, etc. <Selected Delivery Records for IT Facilities> - Chiba Prefecture: New Construction of K Building - Hyogo Prefecture: N C Kobe System Center Building 4 Construction - Chiba Prefecture: ST C K O M Inzai Data Center Construction - Kanagawa Prefecture: HAK BA New Construction - Hokkaido: Rapi S Construction, etc. *For public works and energy facility construction records, please refer to separate materials.
Detailed information
-
To the sleeve. Filling with Tometaro for Eflex penetration (gap between the structure and the piping)~
-
To the sleeve. E-flex penetration (gap between the structure and the piping) upper layer: finishing material filling.
-
To various buried pipelines (1)
-
To various buried pipelines (2)
-
For various purposes (1)
-
For various purposes (2)
-
For various purposes (3)
-
For various purposes (4)
-
For various purposes (5)
Related Videos
Line up(6)
Model number | overview |
---|---|
TM-B5 | Tome Taro 5kg Cup |
TM-B1 | Tome Taro 1kg Cup |
SU-1 | (Optional) Suutaro Backup Material 20×70×1,000L |
HT-1K | (Optional) Hatsu-reiru 1kg bag |
PK375 | (Optional) Pikaristar 375ml (Tome Taro Removal Agent) |
PK375H | (Optional) Pikaristar Box 375ml × 6 bottles (Tome Taro Removal Material) |