All products and services
691~720 item / All 777 items
-

Designated Investigation Agency | Measures for Acceptance Standards to Significantly Reduce Soil Disposal Costs and Rapid Analysis
Measures for acceptance criteria and rapid analysis to significantly reduce disposal costs of surplus soil.
last updated
-

Standards for accepting residual soil and compliance analysis to prevent risks during land sales and factory operations.
Standards for accepting residual soil and compliance analysis to prevent risks during land sales and factory operations.
last updated
-

Analysis and research methods to comply with the strict soil disposal regulations of Chiba, Tokyo Bay, and Saitama.
Analysis and research methods to comply with the strict soil disposal regulations of Chiba, Tokyo Bay, and Saitama.
last updated
-

A comprehensive support method for soil analysis that covers everything from preliminary surveys to meeting acceptance criteria.
A comprehensive support method for soil analysis that covers everything from preliminary surveys to meeting acceptance criteria.
last updated
-

Investigation of soil acceptance standards based on optimal construction methods according to depth and site conditions.
Investigation of soil acceptance standards based on optimal construction methods according to depth and site conditions.
last updated
-

Construction Soil Acceptance Standards Compliance Law for Addressing Strict Additional Regulations in the Metropolitan Area
Law for Clearing Construction Soil Acceptance Standards in Response to Strict Additional Regulations in the Metropolitan Area
last updated
-

Volume-based acceptance criteria and analysis methods for surplus soil based on the amount of generated soil.
Volume-based acceptance criteria and analysis methods for surplus soil based on the amount of generated soil.
last updated
-

The latest analysis method for soil acceptance standards that prevents troubles with reliable safety certification.
The latest analysis method for soil acceptance standards that prevents troubles with reliable safety certification.
last updated
-

Rapid investigation and analysis of residual soil acceptance standards to avoid construction stoppage | Geotech
Rapid investigation and analysis of residual soil acceptance criteria to avoid construction stoppage.
last updated
-

Latest Soil Acceptance Standards to Avoid Legal Risks and Investigation Methods | Geotech
Latest standards for accepting residual soil to avoid legal risks and investigation methods.
last updated
-

Latest acceptance standards to prevent soil disposal troubles and methods for reducing analysis costs.
Latest acceptance standards to prevent soil disposal troubles and methods for reducing analysis costs.
last updated
-
Narrow space drilling technology! Sample collection even in indoor environments and during factory operations.
Narrow space drilling technology! Sample collection even in indoor settings and during factory operations.
last updated
-

Regional Soil Residue Survey Manual! Covers different safety standards for municipalities and disposal sites.
Regional Soil Residue Survey Manual! Covers different safety standards for municipalities and disposal sites.
last updated
-

Early soil contamination measures during operation! Proposal for efficient on-site remediation.
Early soil contamination measures during operation! Proposal for efficient on-site remediation.
last updated
-
Investigation of the Soil Contamination Countermeasures Act! Cost-optimized processes from historical background to overview.
Investigation of the Soil Contamination Countermeasures Act! Cost-optimized processes from historical background to overview.
last updated
-

How to Clear Acceptance Standards for Construction Residual Soil! Avoid Construction Delays with Compliance Analysis.
How to clear the acceptance criteria for construction residual soil! Avoid project stoppages with efficient compliance analysis.
last updated
-

[Not Public] Soil Contamination | Category B
last updated
-
Soil contamination consulting by designated investigation agencies for financial institutions.
Accurate assessment of soil contamination risk in guarantee evaluation.
last updated
-
Soil contamination consulting by designated investigation agencies for real estate development.
Risk assessment for real estate development. Soil contamination consulting by designated investigation agencies.
last updated
-
Soil contamination consulting by designated investigation agencies for the demolition industry.
Soil contamination risk assessment and measures before dismantling
last updated
-
Soil contamination consulting by designated investigation agencies for construction sites.
Experts accurately assess and address the soil contamination risks of construction sites.
last updated
-
Soil Contamination Survey for the Chemical Industry
High-precision contamination investigation to accurately control soil risks in chemical plants.
last updated
-

Soil contamination investigation in the case of land transactions for printing factories.
Know the risks of cleaning agents and plating solutions in printing factories in advance to facilitate land transactions.
last updated
-

Soil contamination investigation eliminates transaction risks through historical research.
Eliminating transaction risks through due diligence investigations.
last updated
-
Soil contamination investigation: Early investigation is essential for operating factories.
Early investigation is essential for factories in operation! Control contamination risks while continuing business.
last updated
-
Ground investigation 【Swedish-style sounding test】
SWS testing based on high-precision data and verification recommended by the society.
last updated
-
Soil investigation: Automatic Ram Sounding Test
Continuous measurement up to N value 50. Optimal ground investigation for confirming the bearing layer of steel pipe piles.
last updated
-
Shallow Correction Work Foundation Reinforcement Work System 【Ganko Oyaji】
Carbon fiber reinforcement system that revives non-reinforced and cracked foundations beyond new construction.
last updated
-
Subsidance Correction Work 【i-LIFT Method】
i-LIFT method that lifts buildings from the ground through grout injection.
last updated
-
Settlement correction work
Establishing a reliable support structure and preventing further settlement, specialized settlement correction methods.
last updated