All products and services
1411~1440 item / All 1791 items
-

Settlement correction work | Repairing settlement and cracks in the cloth foundation without stopping the utility lines!
Construction without stopping city gas or water supply! A technique for safely leveling the settlement and cracks of strip foundations using a steel pipe pile driving method that relies on the weight of the building.
last updated
-

Settlement correction work | Fundamentally solve the settlement of buried waste materials and complex strata with steel pipe piles!
Eliminate foundation settlement caused by debris, buried waste, and uneven strata! A correction technique that prevents re-settlement by fixing to a hard support layer through the pressing of steel pipe piles due to the weight of the building.
last updated
-

Settlement correction work | Restoring trust by fixing settlement and cracks in the base foundation with steel pipe piles!
Immediate repair of shallow residential foundation settlement and cracks! A technology that prevents re-settlement and restores corporate trust using a steel pipe pile driving method that utilizes the building's own weight.
last updated
-

Subsidance Correction Work | House Jacking-Up Construction Plan Without Stopping Lifelines
A plan for jack-up construction of a single-family home to maintain the residents' living conditions. The building's tilt will be precisely corrected in three dimensions using lasers while the water and gas systems remain operational.
last updated
-

Settlement correction work | High-precision horizontal repair of foundation settlement and cracks using steel pipe piles!
Thoroughly solving local subsidence and cracking of fabric foundations caused by earthquakes and ground movement! A technology that performs millimeter-level horizontal restoration and structural reinforcement using steel pipe pile driving and high-precision measurement.
last updated
-

Settlement correction work | Repairing cracks in the foundation and local settlement with steel pipe piles to restore value!
Fundamental solution for local subsidence and cracks in the foundation! A structural repair that utilizes the building's own weight to drive steel pipe piles into the supporting layer, protecting asset value.
last updated
-

Underpinning Renovation Work | A Plan for Jacking Up Detached Houses to Restore Client Trust
A construction plan for jack-up work on single-family homes to maintain the residents' living conditions. This is a site management guideline for contractors to promptly respond to complaints and defects while the owner is still residing in the home.
last updated
-

Settlement correction work | Partial repair of settlement and cracks in the cloth foundation with steel pipe piles while residing.
No need to move; construction can be done while living in the space! Smartly repair local subsidence and cracks in the fabric foundation using steel pipe pile driving methods, minimizing costs and construction time with partial reinforcement.
last updated
-

Settlement correction work | Fundamental repair of settlement at retaining walls and uneven ground with steel pipe piles!
Eliminate the settlement of strip foundations occurring at the backfill of retaining walls and the boundaries of cut and fill! A high-durability settlement correction technology that fixes to a hard support layer by driving steel pipe piles under the weight of the building.
last updated
-

Settlement correction work | Partial correction of cracks in the base foundation and localized settlement using steel pipe pile driving!
Fundamental solution for local subsidence and cracks in the foundation! A partial repair technique that utilizes the building's own weight to drive steel pipe piles into deep support layers, preventing further subsidence.
last updated
-

Subsidance correction work | Construction plan for jack-up work on a detached house while living in it.
A plan for jack-up construction of single-family homes to maintain the residents' living conditions. The tilt of the building will be corrected to the millimeter without the need for temporary housing, while you continue to live in your home.
last updated
-

Accelerating real estate transactions by early detection of soil contamination through independent surveys for the chemical industry.
Environmental Management for the Chemical Industry: Early Detection of Soil Contamination through Self-Assessment to Accelerate Real Estate Transactions
last updated
-

Early determination of soil contamination through independent surveys for logistics facilities to accelerate real estate transactions.
Independent research to facilitate the selection of logistics facility locations. Accelerating transactions through early detection of soil contamination.
last updated
-

Early determination of soil contamination through independent surveys for factory site redevelopment to accelerate real estate transactions.
Promoting the reuse of former factory sites. Early assessment of soil contamination through self-investigation.
last updated
-

[For the Construction Industry] Early Detection of Soil Contamination through Self-Investigation to Accelerate Real Estate Transactions
For the construction industry: Early determination of soil contamination to achieve shortened construction periods.
last updated
-

Accelerating transactions with early detection of soil contamination for real estate development.
Early assessment of soil contamination through independent investigation to facilitate real estate transactions.
last updated
-

Soil investigation to prevent transaction risks of factory sites for the plastic products industry.
Avoid soil contamination risks in site regeneration through prior investigation.
last updated
-

Soil investigation to prevent risks in the sale of factory sites for printing and binding | Geotech
Avoiding contractual non-compliance liability due to specific hazardous substances at the time of factory sale.
last updated
-

Soil Investigation to Prevent Land Sale Risks for Metal Processing Factories | Geotech
Sale of the former metal processing factory site, avoiding soil contamination risks in advance.
last updated
-

Soil investigation to prevent risks in the sale of factory sites for the chemical industry | Geotech
Avoiding contractual non-compliance liability due to specific hazardous substances at the time of factory sale.
last updated
-

Soil investigation to prevent risks in the sale of factory sites for real estate development | Geotech
Reduce the risk of defects in the sale of factory site remnants through voluntary historical investigations conducted in advance.
last updated
-

Managing potential contamination risks in factories for plastic product manufacturing to protect the land.
The potential contamination risks of operating factory sites are managed through voluntary investigations by designated research institutions.
last updated
-

Designated Research Institution for Electronic Component Manufacturing | Management of Potential Contamination Risks During Factory Operations
Managing potential contamination risks through voluntary surveys on operating factory premises.
last updated
-

Management of Potential Contamination Risks During Factory Operations for Printing and Binding
Protecting land value through voluntary investigations during operations to mitigate ink contamination risks.
last updated
-

Designated Research Institution for Metal Processing | Management of Potential Contamination Risks During Factory Operations
Voluntary historical surveys and analyses by designated investigation agencies for heavy metal management.
last updated
-

Management of Potential Contamination Risks and Preservation of Land Value During Factory Operations for the Chemical Industry
Managing potential contamination risks through voluntary surveys on operating factory premises.
last updated
-

Preventing Delays in Ground Contamination Risk Management for Residential Development
Before the start of residential development, a designated investigation agency visualizes the potential contamination risks of the ground.
last updated
-

Manage potential soil contamination risks before development for commercial facilities to prevent delays.
Before the location survey of commercial facilities, the potential contamination risks of the ground are visualized by a designated investigation agency.
last updated
-

Management of potential contamination risks in the ground before development for warehouse and logistics land to prevent delays.
Visualize the potential contamination risks of the ground during the land selection phase to prevent development delays.
last updated
-

Managing potential soil contamination risks before factory relocation in the manufacturing industry to prevent delays.
Before the factory relocation, the potential contamination risks of the ground were visualized by a designated investigation agency to prevent delays.
last updated