ジオテック Official site

Designated Investigation Agency | Method for transporting excavated soil from urban compact apartment construction sites

A method for safely and quickly transporting soil in a construction area of a small apartment building with strict site constraints, utilizing area-specific management, a flexible soil removal plan, and a short-term public analysis.

In urban centers and bustling districts, there are severe spatial constraints in condominium development due to extremely limited site areas, making it impossible to secure a yard for temporarily storing excavated soil. This document compiles advanced construction wisdom to overcome such adverse conditions unique to "narrow work zones," enabling the safe and rapid transportation of soil off-site. It specifically explains the practical implementation of ultra-high-density "zone-specific management" to ensure efficient movement of heavy machinery in tight spaces, as well as the flexible construction of a detailed "soil transportation plan" with precise scheduling on an hourly basis. Furthermore, it thoroughly covers the utilization of "short delivery time public analysis" to maximize support for operations in confined areas by minimizing lead times, and the compact sampling techniques of geotechnical engineering that function accurately even in harsh site environments with many obstacles. This is a specialized document aimed at ensuring construction efficiency is not compromised due to site constraints.

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

The urban-type specification of this method features a compact design that strongly supports construction in confined sites with limited land area. As a sampling specification, it applies portable or simplified mechanical sampling techniques that can operate in narrow work areas where large boring machines cannot enter. The specifications for area-specific management and soil transport plans implement just-in-time dispatch management based on the maximum load capacity of the temporary storage yard. The short-term public analysis specifications provide judgment data to the site at an ultra-fast speed that is below the retention time limit for soil, overcoming site constraints with technical capabilities.

Price information

-

Price range

P3

Delivery Time

P4

Model number/Brand name

Soil survey

Applications/Examples of results

The main purpose is the off-site transportation of excavated soil associated with condominium development and building reconstruction projects conducted in "narrow sites" such as city centers and in front of train stations. There is a critically insufficient space on-site for temporarily storing soil, and it is optimally utilized under harsh conditions where the operation routes of heavy machinery are restricted. It is used for high-density management of work areas to effectively utilize the limited yard and for flexible soil transportation planning that involves precise scheduling adjustments on an hourly basis. It is implemented in conjunction with rapid delivery of judgment data that falls below the temporary storage limit for soil, aiming to maximize the potential of narrow sites.

Designated Investigation Agency | Soil Contamination Survey | Method for Rapid Removal of Excavated Soil in Small-scale Condominium Development with Area-specific Management and Flexible Planning | Geotech

TECHNICAL

Soil contamination survey

PRODUCT

Distributors

Recommended products