ジオテック Official site

Soil Survey to Optimize Residual Soil from Apartments for Land Utilization Companies

We support the proper separation of surplus soil in pre-development soil surveys, optimizing transportation costs and maintaining the construction schedule.

In the condominium development business by land utilization companies, the proper handling of excavated soil resulting from construction work and the associated cost management are crucial. Especially in projects involving deep excavation, there is a risk of delays in construction schedules and unexpected additional costs if compliance with soil regulations and acceptance site standards cannot be demonstrated in advance. Geotech's comprehensive soil investigation accurately visualizes the quality of excavated soil through phased sampling before development, addressing these challenges and supporting smooth project progress. 【Usage Scenarios】 - Soil risk assessment before acquiring land for condominium development and during the development planning phase - Formulating plans for the removal of construction-generated soil associated with deep excavation work - Sites requiring proof of compliance with municipal regulations and acceptance site standards 【Benefits of Implementation】 - Optimization of disposal costs through the prior separation of contaminated soil and reusable excavated soil - Maintaining construction schedules and ensuring smooth removal operations by securing legal evidence - Early identification of contamination risks through phased investigations from Phase 1 to Phase 3

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

【Features】 - Diagnosis of contamination risk differences through Phase 1 historical site assessment - Borehole core sampling and phased sampling up to a maximum depth of 10 meters - Official analysis corresponding to all 29 specified hazardous substances, including total cyanide, lead, and hexavalent chromium - Measurements compliant with construction soil disposal standards of each prefecture and municipal soil regulations - Provision of reliable legal evidence based on measurement certification 【Our Strengths】 As a designated investigation agency by the Ministry of the Environment, we provide one-stop services from ground surveys to soil contamination investigations and ground reinforcement. With extensive experience, solid technical capabilities, and official analysis with extremely short turnaround times, we fully support our clients' land utilization projects as ground experts.

Price information

 

Price range

P3

Delivery Time

P4

Model number/Brand name

Soil contamination survey

Applications/Examples of results

This survey method is used to obtain prior approval for the acceptance of excavated soil generated during large-scale excavation associated with underground pits and pile foundation work during the construction of urban apartments, as well as civil engineering works such as subways and infrastructure development. It provides evidence of full compliance with the strict chemical substance standards specified by the receiving sites and disposal sites, thereby preventing delays of loading and transportation trucks on-site. Additionally, it addresses public needs for minimizing disposal costs through grid-based management for each construction section, expediting administrative consultations based on residual soil regulations, and providing safety operation certifications for clients and surrounding residents.

Designated Investigation Agency | Soil Contamination Survey | A method to achieve optimization of excavation waste removal costs by sorting large amounts of apartment excavation residual soil through phased sampling | Geotech

TECHNICAL

Soil Contamination Survey and Historical Investigation Brochure for Real Estate Companies

PRODUCT

Distributors

Recommended products