関西化工 Official site

Replacement work for new resin due to duct aging.

We would like to introduce a case study of duct work at a certain private facility!

We would like to introduce a case study of duct work carried out by Kansai Chemical at a certain private facility. The existing iron duct was corroded and damaged, raising concerns about its impact on other equipment in the blower room. As a countermeasure, after conducting a site survey, we manufactured a duct of the same size using PVC. Replacement work was carried out. 【Case Study】 ■ Production time: Approximately 3 weeks ■ Work duration: 1 day ■ Type of work: Piping work ■ Date: January 2019 ■ Equipment used: PVC duct 600x2010H *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://kansaikako.co.jp/water/

basic information

【Related Products】 ■ Vibration Isolation Joint ■ Damper ■ Duct Flange *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Construction Example: "Duct Work"

PRODUCT

Corrosion-resistant! PVC air volume control damper.

PRODUCT

"Proposal for Aging Diagnosis, Safety Measures, and Energy Conservation" ver.2

PRODUCT

Distributors

Recommended products