Maintenance and management of drainage facilities

Maintenance and management of drainage facilities
This is information regarding the maintenance of drainage treatment facilities and measures for aging infrastructure.
1~18 item / All 18 items
-
Chlorine agent shooter
Chlorine can be easily added to the chlorine sterilizer located below ground level from any angle!
last updated
-
Technical Data: "Aging Diagnosis, Safety Measures, Energy Conservation"
Technical documents filled with know-how on aging countermeasures, safety measures, and energy conservation for water treatment facilities.
last updated
-
Renovation Product Catalog
Introducing a wide range of products related to water treatment and organic matter treatment!
last updated
-
Float catcher for checking the float of the submersible pump.
Solve your worries during water pump float inspections! We have two types available: a float catcher only and one with an adjustable pole.
last updated
-
Replacement work for new resin due to duct aging.
We would like to introduce a case study of duct work at a certain private facility!
last updated
-
Renovation work on the sedimentation tank of the industrial waste treatment facility.
Introduction of a case study on the replacement work of the aging Yosui Weir with new resin materials.
last updated
-
[Construction Example] Replacement Work of Water Receiving Tank FRP Panel Tank
Manufactured a panel tank of the same size! This is an example of renovation work due to the aging of the water storage tank.
last updated
-
[Construction Example] Certain Clinic Checker Plate Replacement Work
This is a case study of replacement work due to corrosion of the parking lot's septic tank cover and receiving frame.
last updated
-
[Construction Example] FRP Tank Repair Work
This is an example of repair work due to deterioration and concerns about damage and liquid leakage from aging FRP tanks.
last updated
-
[Construction Example] FRP Loose Lining Work
This is an example of repair by installing FRP panels on the inside of deteriorated concrete tanks.
last updated
-
[Construction Case] Certain Housing Complex - Trench and Center Well Replacement Work
This is a case study of the replacement work of an aging iron overflow weir with a new resin one.
last updated
-
Covering "FFRP"
Covering for floors and sidewalks using corrosion-resistant FRP and polyurethane foam! Usable with standard angles.
last updated
-
[Construction Example] PVC Lining Work at a Certain Manufacturing Plant
Introducing the renovation work due to the aging of the acid washing tank at the ironworks, with a production period of 4 days and a work period of 20 days!
last updated
-
[Construction Case] Replacement Work of Hypochlorite Storage Tank at a Certain Water Purification Plant
Production period: 45 days, working days: 3! We will introduce the renewal work due to the aging of the secondary storage tank.
last updated
-
[Construction Case] Replacement Work of Storage Tank at a Certain Hospital
Introducing a replacement project due to PVC tank leakage, with a production time of 1 month and a work time of 1 day!
last updated
-
Cartridge-type activated carbon deodorization device
Overwhelmingly easy maintenance! By using activated carbon in the cartridge, it absorbs odors.
last updated
-
Renovation work on the dialysis wastewater treatment neutralization tank <Aging countermeasures>
Proposal for "PVC Neutralization Tanks" characterized by long lifespan and short delivery times! It is also possible to deliver in two parts and assemble on-site.
last updated
-
FRP checker plate
Supports lids made of resin, metal, and more! We also handle new installations, replacements, site surveys, and on-site construction!
last updated