Renovation work on the sedimentation tank of the industrial waste treatment facility.
Introduction of a case study on the replacement work of the aging Yosui Weir with new resin materials.
We would like to introduce a case study of our sedimentation tank renovation work. At a certain private waste disposal facility, the existing overflow weir had collapsed due to aging, necessitating prompt restoration. After conducting a site survey, we manufactured a new overflow weir of the same size using PVC and carried out replacement work, including surrounding equipment. As a result of the work, replacing the sedimentation tank's overflow weir with a new resin one led to the restoration of the industrial waste processing capacity. 【Case Study】 ■ Project Name: Renovation of Sedimentation Tank at a Certain Private Waste Disposal Facility ■ Manufacturing Duration: Approximately 4 weeks ■ Working Days: 2 days ■ Cost: Approximately 1,200,000 yen ■ Type of Work: Piping work, Equipment installation ■ Date: January 2019 ■ Location: Chiba Prefecture *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Equipment Used】 ■ Overflow Weir ■ Measuring Tank ■ Center Well ■ Scum Skimmer *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.