関西化工 Official site

[Construction Example] Replacement Work of Water Receiving Tank FRP Panel Tank

Manufactured a panel tank of the same size! This is an example of renovation work due to the aging of the water storage tank.

We would like to introduce a case of replacing a water storage tank with an FRP panel tank at a certain environmental center. The company faced the issue of water leakage due to the aging of the existing water storage tank. Therefore, after a site survey, a panel tank of the same size was manufactured, and replacement work was carried out on-site. 【Case Details】 ■ Manufacturing period: Approximately 30 days ■ Type of work: Equipment installation ■ Work duration: 2 days ■ Date/Location: March 2019/Gifu Prefecture ■ Equipment used: FRP panel tank *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://kansaikako.co.jp/water/

basic information

【Related Products】 ■FRP Tank ■PVC Ladder ■Ventilation Port ■Gauge Valve *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Example] Replacement Work of Water Receiving Tank FRP Panel Tank

TECHNICAL

Distributors

Recommended products