[Construction Example] Certain Clinic Checker Plate Replacement Work
This is a case study of replacement work due to corrosion of the parking lot's septic tank cover and receiving frame.
Here is an example of the replacement work for the cover of a septic tank in the customer parking lot of a certain clinic. The existing SUS cover and frame at the site were corroded and deteriorated, posing a risk of sagging and falling whenever a vehicle drove over them. We adopted a corrosion-resistant FRP cover that can withstand the weight of vehicles. The existing frame was removed, and a new SUS frame was installed. 【Construction Example】 ■ Production Time: Approximately 1.5 months ■ Type of Work: Equipment Installation ■ Work Days: 2 days ■ Date/Location: December 2019/Saitama Prefecture ■ Equipment Used: FRP rectangular manhole, SUS frame *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Related Products】 ■FFRP ■Grating *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.