[Construction Example] PVC Lining Work at a Certain Manufacturing Plant
Introducing the renovation work due to the aging of the acid washing tank at the ironworks, with a production period of 4 days and a work period of 20 days!
We would like to introduce a case study of PVC lining work carried out by Kansai Chemical Co., Ltd. at a certain manufacturing facility. The existing acid washing tank was experiencing issues with shape deterioration and peeling due to erosion. As a countermeasure, after conducting a site survey, we performed lining with PVC plates and carried out replacement work on-site. 【Project Data】 ■ Content: Renewal work due to aging of the acid washing tank at the ironworks ■ Issue: Shape deterioration and peeling of the existing acid washing tank due to erosion ■ Countermeasure: After a site survey, lining was done with PVC plates, and replacement work was carried out on-site. *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Construction Case】 ■Production Days: 4 days ■Type of Work: Lining ■Working Days: 20 days ■Date/Location: September 2015 / Kochi Prefecture ■Equipment Used: PVC Plate *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.